Static pressure residua pressure flowing outlet psi inlet psi inlet psi outlet psi hydrostatic tests shall be made at not less than 200 psi. Inspection, testing, and maintenance water storage tanks nfpa. Nfpa 25 standard for the inspection, testing, and maintenance of waterbased fire protection systems 2017 edition reference. In 1925, the committee on field practice prepared a standard on outside protection, private underground piping systems supplying water for fire extinguishment, which was adopted by nfpa.
Inspection, testing, and maintenance of waterbased fire. Protection systems, published by the national fire protection association nfpa, requires that the main drain of an automatic sprinkler system should be tested at least annually and more often for special conditions as noted in table. In each case, all manual and automatic valves associated with a tank fill are to be. The standard also identifies actions to take when changes in occupancy, use, process, materials, hazard or water supply that impact the performance of the system are planned.
Nfpa 25 technical committee for inspection, testing and. Oct 08, 2019 in all, nfpa 25 2020 sets the minimum guidelines for the periodic inspection, testing, and maintenance of waterbased fire protection systems. Testing nfpa 25 also requires regular testing of standpipe systems to ensure that the components will operate. New language was added to address confirmation of pressure. All information obtained will be returned to the university fire marshal for further calculation and graphing of the fire pump test results. Information on this form covers the minimum requirements of nfpa 25 1998 for centrifugal fire pumps. Standard for the installation of stationary pumps for fire protection, which aims to ensure that systems will work as intended to deliver adequate and reliable water supplies. Nfpa 25, the standard for the inspection, testing and maintenance. The hydrostatic test pressure is usually between 1. Inspection, testing, and maintenance fire pumps nfpa 25, chapter 8 as amended by ccr, title 19 page 1 of 8 date of inspection, testing, maintenance. Quick guide for fire sprinkler inspection requirements key. An appliance that is approved for a higher inlet pressure. Errata no 25 172 the technical committee on inspection, testing, and maintenance of waterbased systems notes the following errors in the 2017 edition of nfpa 25, standard for the inspection, testing, and maintenance of waterbased fire protection systems. Inspection, testing, and maintenance water storage tanks.
Nfpa 25 makes the owner responsible for properly maintaining the building fire sprinkler system. Inspectors should familiarize themselves with nfpa 25 itm waterbased fire protection systems. Testing of system components should be performed by trained service persons, using procedures established by the equipment manufacturer and the appropriate nfpa. Closing the main control valve and opening the main drain allows the system to be completely drained for maintenance or repair purposes, and nfpa 25 requires the main drain and the piping that leads to it to be tested on an annual or quarterly basis. This edition of nfpa 25, standard for the inspection, testing, and maintenance of waterbased. The hydrostatic pressure test is a leak test intended to validate the integrity of the pipeline. This means that the fire department connection for manual dry standpipe and semiautomatic standpipe systems still need to be tested at 200 psi. Nfpa 25 2011 edition inspection, testing, and maintenance of waterbased fire protection systems 1nfpa 25 2011 edition standard for the inspection, testing, and maintenance of waterbased fire protection systems item frequency reference inspection gauges dry, preaction, and deluge systems weeklymonthly 5. A full flow test shall be conducted on each valve at 5year intervals and shall be compared to previous test results. Slowly open the main drain fully and allow water flow to stabilize.
The purpose of this guide is to help you determine if the system will work as intended. Correct the frequency in the tables as indicated below. Standpipe systems types, inspection, testing, and maintenance. The test pressure at rated flow is within 95% of the initial certified field test curve. Nfpa 25 also requires regular testing of standpipe systems to ensure that the components will operate properly and safely.
This document establishes the minimum requirements for the periodic inspection, testing, and maintenance of waterbased fire protection systems and the actions to undertake when changes in occupancy, use, process, materials, hazard, or water supply that potentially impact the performance of the waterbased system are planned or identified. Nfpa 25 standard for the inspection, testing, and maintenance of waterbased fire protection systems 2002 edition nfpa, 1 batterymarch park, po box 9101, quincy, ma 022699101 an international codes and standards organization nfpa license agreement. All standpipe pressure regulating devices piping hose connections hose nozzles all hoses, hose storage devices, and hose cabinets. Testing nfpa 25 also requires regular testing of standpipe systems to ensure that the components will operate properly and safely. Pressure will build up in the fire protection system and blowouts will occur. Nfpa 25 2014 edition inspection, testing, and maintenance of waterbased fire protection systems 1nf pa 25 2014 edition standa rd f ohe inspec ion, t eing, d mai nc of w based f ro cti n sy m table 5. The requirements contained in nfpa 25 are based on the type of. Nfpa 252014 standard for the inspection, testing, and. Inspection, testing, and maintenance fire sprinkler system. The pressures in piping at higher elevations shall be permitted to be less than 200 psi. Origin and development of nfpa 25 the first edition of nfpa 25 was a collection of inspection, testing, and maintenance provisions that helped ensure the successful operation of waterbased fire protection.
Oct 19, 2017 nfpa 25 2017 edition standard for the inspection, testing, and maintenance of waterbased fire protection systems tia log no 1287 reference. Standard for the inspection, testing, and maintenance of waterbased fire protection systems addresses minimum testing requirements for fire pumps. Nfpa 25, standard for the inspection, testing, and maintenance of waterbased fire protection systems, 2014 edition. Key deficiencies to look for with nfpa references references. Test pressures shall be held for a length of time satisfactory to the authority having jurisdiction but in no case less than 15 minutes with no perceptible drop in pressure. Test pressure tanks at normal water level and air pressure and measure air pressure drop which shall not exceed 112 psi 0. The nfpa commi ttee on field practice amended the specifications in 1926, published as nfpa 25. Automatic and manual controllers for applying the energy source to the driver sha. What is hydrostatic testing of a buildings fire protection. Hard copies are available to fire and building officials.
Quick guide for fire sprinkler inspection requirements. Manual by the us department of transportation federal highway adm. Standard for the inspection, testing, and maintenance of. The first edition of nfpa 25 was a collection of inspection, testing, and. It is wrong, and unsafe, for nfpa 25 to come along and say that the pump now needs to be run without recirculating the water. At the end of 10 minutes, the pressure drop shall not exceed 20 percent of the test pressure. Nfpa 25 standard for the inspection, testing, and maintenance.
Modifications that cannot be isolated, such as relocated drops, shall not require testing in excess of system working pressure. Nfpa 25 2017 edition standard for the inspection, testing, and maintenance of waterbased fire protection systems tia log no 1287 reference. Use of this form does not relieve the owner of the responsibility for complying with other requirements of nfpa 25 1998 for the inspection, testing and maintenance of fire pumps. Periodic testing of systems for pressure leakage nfpa 25 2017. Inspection, testing, and maintenance water storage tanks nfpa 25, chapter 9 as amended by ccr, title 19 page 1 of 2 date of inspection, testing, maintenance. Inspection, testing, and maintenance itm fixed fire protection and. Guidance for field hydrostatic testing of high density. Jan 01, 2003 to outline the requirements of national fire protection association chapter 25 standard for the inspection, testing, and maintenance of waterbased fire protection systems as it relates to the internal pipe inspections and obstruction investigations of fire sprinkler systems. The structural committee is a permanent committee of fpa. Maintenance and testing should be in accordance with nfpa 25. Nfpa 25 code requirements alliance fire and safety. Nfpa 25 standard for inspection, testing, and maintenance of waterbased fire. Was a pressure test measured with a manometer or with a pressure.
Elevation is used to create the pressure needed to cause water flow. It is the facilitys responsibility, therefore, to ensure that only properly trained and competent persons perform inspections, testing and maintenance on its system. Nfpa 25 is available for purchase from nfpa online at. The pressure at the oil supply inlet to an oilburning appliance shall not exceed 3 psig gage pressure of 21 kpa. Nfpa s investigative report on the one meridian plaza fire can also be obtained from nfpa online. It has been suggested that nfpa 25 could stay as it is without this tia and that the users of nfpa 25 could be retrained. Nfpa 780, standard for the installation of lightning protection systems, 2014 edition. Nfpa 31 fuel oil piping, installation and testing chapter. This is a quick reference field guide, with select abbreviated sections of nfpa 25, 72 and the plumbing code. Testing of system components should be performed by trained service persons, using procedures established by the equipment manufacturer and the appropriate nfpa standards. A valve shall not be subjected to the test pressure unless it is determined that the valve, including the valveclosing mechanism, is designed to safely withstand the pressure. Nfpa standards, the national fire protection association has issued the following tentative interim amendment to nfpa 25, standard for the inspection, testing, and maintenance of waterbased fire. Oshem shall be immediately informed if a drop is discovered, as this represents an emergency situation that could result in insufficient water supply for the facility fire sprinkler systems. Nfpa 31 fuel oil piping, installation and testing chapter 8.
If dry barrel hydrants are tested with the main valve open, so the hydrants are under pressure, an additional 5 oz per minute 150 mlmin leakage is permitted for each hydrant. This inspection shall include an air, co 2, or nitrogen pressure test, at which time the gas piping shall stand a pressure of not less than 10 psi 69 kpa gauge pressure. Manual, semiautomatic, or dry standpipe valve does not. A main drain test is used to identify major reductions in water flow for the system under. Inspection, testing, and maintenance fire pumps nfpa 25, chapter 8 as amended by ccr. Understanding and applying nfpa 25 texas fire protection. This edition of nfpa 25 was approved as an american national standard on january 31, 2002.
684 524 1388 733 666 229 616 1492 1536 1439 1063 373 1475 797 570 14 846 395 929 610 893 1329 1182 377 460 988 440 303 1103 1257 881